☀ PM Surya Ghar Registered EPC

How to Choose the Best Solar Company: 10-Point Checklist

Solar Basics 📅 14 May 2026 ⏱ 1 min read
Solar engineer inspecting quality of rooftop installation

The solar system you buy is only as good as the company that installs it. With hundreds of installers in the market, this 10-point checklist will help you separate professionals from part-timers.

The Checklist

  1. Government registration — Is the company registered on the PM Surya Ghar portal? Unregistered vendors cannot get you the subsidy.
  2. MSME / company credentials — Verify business registration and GST.
  3. Component transparency — Do they name the exact panel, inverter and structure brands in the quotation?
  4. DCR panel compliance — Subsidy requires DCR (domestically manufactured) panels. Insist on documentation.
  5. Site survey before quote — A serious company surveys first, quotes after.
  6. Generation estimate in writing — Ask for expected monthly units, not vague promises.
  7. Warranty clarity — Panel performance (25 yrs), inverter (5–10 yrs), workmanship (min. 5 yrs).
  8. Net metering & subsidy handling — Included in scope, or your headache?
  9. After-sales service — Local team? AMC options? Response time commitment?
  10. References & reviews — Ask for nearby installations you can actually see.

Red Flags to Avoid

  • Quotes far below market average (component quality is being cut somewhere)
  • Pressure to pay a large advance before any survey
  • No physical office or service presence in your region
Sunvera Energy welcomes every question on this checklist — transparency is how long-term trust is built.
Ready to go solar?

Get a free site survey & PM Surya Ghar subsidy guidance.