Incomplete paperwork is the #1 reason solar subsidy applications get delayed. Keep this checklist handy — or simply let Sunvera Energy's documentation team handle it all for you.
Personal Documents
- Aadhaar card of the applicant
- PAN card
- Passport-size photograph
- Mobile number linked with Aadhaar
Property & Electricity Documents
- Latest electricity bill (connection must be in applicant's name)
- Consumer number and DISCOM details
- Proof of roof ownership / property documents
Bank Details
- Bank account number and IFSC (subsidy is credited via DBT)
- Cancelled cheque or passbook front page
Technical Documents (Prepared by Your EPC)
- Solar system specification sheet and single-line diagram
- DCR panel certificates and inverter datasheets
- Installation completion report with geotagged photos
- Electrical safety / CEI compliance where applicable
Common Mistakes That Delay Subsidy
- Electricity connection in a different family member's name
- Bank account not linked to Aadhaar for DBT
- Non-DCR panels used by unregistered vendors — subsidy rejected
- Mismatched name spellings across documents
With Sunvera Energy, our team verifies every document before submission — most of our customers receive their subsidy without a single query.