You do not need an engineer to get a first estimate of your solar size — your electricity bill already holds the answer. Add up the units consumed over the last twelve months and divide by 1,500, the yearly output of 1 kW of rooftop solar in Madhya Pradesh and Chhattisgarh. A home that used 4,500 units needs about 3 kW. Here is how to find the right numbers on an MPMKVVCL, MPPKVVCL or CSPDCL bill.
Key Takeaways
- Use 12 months of units (kWh), not rupees — tariffs and fixed charges distort the rupee figure.
- Rule of thumb for MP and CG: annual units ÷ 1,500 = kW of solar needed.
- Check the sanctioned load on the bill: your solar size cannot exceed it without an enhancement.
- Note the connection category and phase — they decide subsidy eligibility and inverter type.
- The consumer name and number must match the applicant for PM Surya Ghar.
Step 1 — Find the units consumed
Every bill shows the previous and current meter readings and the difference: units consumed, in kWh. This is the number that matters. Ignore the rupee total for sizing — it includes fixed charges, duty, subsidies and arrears, and slab tariffs make it non-linear. Collect twelve months, because consumption swings widely: a Gwalior or Bilaspur home might use 150 units in January and 450 in May. If you have only a few recent bills, most DISCOMs show a consumption history on the bill or their consumer portal.
Step 2 — Apply the 1,500 rule
In Madhya Pradesh and Chhattisgarh, 1 kW of well-installed, shade-free rooftop solar produces about 1,450–1,550 units a year. So:
| Annual units on your bills | Monthly average | Solar size | Typical home |
|---|---|---|---|
| 1,500 | ≈ 125 | 1 kW | Small home, no AC |
| 3,000 | ≈ 250 | 2 kW | 2 BHK, coolers |
| 4,500 | ≈ 375 | 3 kW | 2–3 BHK, one AC |
| 7,500 | ≈ 625 | 5 kW | 3 BHK, two ACs |
| 15,000 | ≈ 1,250 | 10 kW | Large house or shop |
Round to the nearest standard size. If a new AC or an electric vehicle is coming soon, add its expected units before dividing.
Step 3 — Check the sanctioned (connected) load
The bill shows your sanctioned load or contract demand in kW. Under net-metering rules in both states, rooftop solar capacity is limited to the sanctioned load. Many older homes are sanctioned at 1 or 2 kW even though they now run ACs. If your calculation says 3 kW but the bill says 1 kW, a load-enhancement application is needed first — a routine step that Sunvera files with the DISCOM along with the net-metering application.
Step 4 — Note category, phase and consumer details
- Tariff category — domestic, non-domestic (commercial), industrial or agricultural. Only domestic connections, and housing-society common areas, qualify for the PM Surya Ghar subsidy.
- Phase — single-phase or three-phase. Systems up to about 5 kW usually use single-phase inverters; larger systems need three-phase supply.
- Consumer number and name — the PM Surya Ghar application uses the consumer number, and the name must match the applicant. If the bill is in a late parent's or previous owner's name, transfer it first.
Step 5 — Look at the rupees, for savings
Now the rupee figure becomes useful — not for sizing, but for estimating savings. Solar removes your most expensive units first, the ones in the top slab. Divide the energy charge by the units for the summer months to see roughly what each top-slab unit costs you, usually ₹6–7 for domestic and ₹8–11 for commercial connections. Multiply by the solar generation to estimate annual savings, then compare with the system price after subsidy to get the payback.
A worked example
A Shivpuri family's twelve bills show these monthly units: 180, 165, 210, 320, 430, 410, 300, 260, 280, 250, 200, 190. The total is 3,195 units. Divided by 1,500, that gives 2.13 kW — so a 2 kW system covers almost all of it, and 3 kW would leave a surplus. The bill shows a sanctioned load of 2 kW and a single-phase domestic connection in the father's name, who is the applicant. Recommendation: a 2 kW single-phase on-grid system, about ₹1,40,000–1,50,000 installed, ₹60,000 subsidy, no load enhancement needed. If the family plans a second AC next year, adding about 750 units a year, 3 kW with a load enhancement to 3 kW becomes the better choice.
Commercial bills are different
Shops, offices and factories on non-domestic or industrial tariffs often have a demand charge based on the maximum kW or kVA drawn, a power-factor adjustment, and sometimes time-of-day rates. Solar reduces energy units but does not always reduce peak demand, because a cloudy afternoon can still hit the peak. For these connections Sunvera sizes from the units and, where available, the meter's load data, and models savings on the energy charge separately from demand charges so the payback figure is honest.
Common mistakes
- Sizing from one summer bill. May's bill exaggerates the year and leads to an oversized system whose surplus is paid at a low rate.
- Sizing from rupees. A ₹3,000 bill does not mean the same units on every tariff.
- Filling the roof. Roof area sets the maximum, not the right size.
- Ignoring sanctioned load. It stalls the net-metering application if not raised in time.
- Applying in the wrong name. A name mismatch is the commonest reason subsidy claims get stuck.
Let us check it for you
Photograph your last twelve bills, or download them from your DISCOM's portal, and send them on WhatsApp to +91 77103 07937. Sunvera Energy will reply with the recommended size, the sanctioned-load position, subsidy eligibility, price and payback for your home or business — then confirm everything at a free site survey.
Frequently Asked Questions
Add the units consumed (kWh) over the last twelve months and divide by 1,500 — the yearly output of 1 kW in Madhya Pradesh and Chhattisgarh. A home using 4,500 units a year needs about 3 kW; 7,500 units needs about 5 kW.
Because the rupee total includes fixed charges, duty and arrears, and slab tariffs make it non-linear. Units consumed measure the actual energy your home uses, which is what the solar system has to replace.
It is the maximum load your DISCOM connection is approved for, shown in kW on the bill. Rooftop solar capacity is limited to it under net-metering rules, so if you need 3 kW on a 1 kW connection, a load enhancement is filed first.
Yes. The PM Surya Ghar application uses the consumer number, and the consumer name must match the applicant. If the bill is in a previous owner's or a late parent's name, transfer the connection before applying.