☀ PM Surya Ghar Registered EPC
Madhya Pradesh · Gwalior-Chambal

Off Grid Solar System in Shivpuri — Power Without a Grid Connection

An off grid solar system in Shivpuri gives power where MPMKVVCL's line does not reach or cannot be relied on: a farmhouse two kilometres from the nearest pole, a new house in a village hamlet still waiting for a connection, a temple or ashram on a hill, a site office or a highway dhaba on the Gwalior–Jhansi road. The panels charge a battery bank in the day and the battery runs the load at night, with no electricity bill and no grid at all. Sunvera Energy designs and installs these systems from its head office at Pichhore, and because it is in the same district, battery and inverter service is local too.

When off-grid is the right choice

Off-grid is the answer only when the grid is genuinely absent or so far away that a new line would cost more than the system. In Shivpuri district that means scattered farmhouses in Pohri, Karera and Khaniyadhana blocks, hamlets on the forest edge near Madhav National Park, tube-well rooms where the family stays during sowing and harvest, temples and ashrams away from the road, and construction or quarry site offices that need a few lights and a fan for a year or two.

If your house already has a connection but suffers long cuts, a hybrid system is better value: it uses the grid when it is there, saves on the bill through net metering, qualifies for the subsidy and still gives battery backup. Families in town around Sadar Bazaar or Court Road almost never need off-grid.

Sizing the system to the night

An off-grid system is sized from the load, not the roof. We list every appliance and the hours it runs, then size the battery for the night plus two cloudy days, and the panels to refill the battery even in short winter days and monsoon cloud.

LoadTypical systemApprox. price
Lights, fans, TV and mobile charging1 kW with batteryPriced after load survey
Add a fridge and a cooler2 kW with batteryPriced after load survey
Full farmhouse with small pump3 kW with battery≈ ₹2.8–3.5 lakh

Heavy loads like an AC, a geyser, an iron or a large motor drain a battery fast. They are better run in the day directly from the panels or kept off the system.

Lithium or lead-acid batteries

The battery is the most expensive part to replace. Tubular lead-acid batteries cost less at the start, need distilled water topping and last around four to six years with care. Lithium (LiFePO4) batteries cost more but need no water, handle deeper daily use and last eight to ten years or more. For a farmhouse visited only at harvest, lead-acid is often enough; for a family living off-grid every day, lithium usually works out cheaper over ten years. Batteries are kept in a ventilated, shaded room, because a Shivpuri summer above 44 °C shortens battery life.

Why there is no subsidy or net meter

The ₹78,000 central subsidy under PM Surya Ghar is linked to a grid-connected domestic meter, and net metering needs a grid to export to. An off-grid system has neither, so it is paid for in full. Bank loans are still possible for many buyers, and the system replaces kerosene, diesel and the cost of an extended line. When the grid later reaches the house, the panels can be reused in an on-grid or hybrid system and the subsidy claimed on new capacity where rules allow.

Service far from town

Remote systems need a local service team. Ours works from Pichhore and visits anywhere in the district, checks battery health and connections twice a year, and replaces failed parts under warranty. Panels carry a 25–30 year warranty and inverters and batteries carry the manufacturer's warranty, which we register in the owner's name. Call +91 77103 07937 to book a load survey.

Frequently Asked Questions — Solar in Shivpuri

Get a free site survey in Shivpuri

Written generation estimate, exact price after subsidy and bank-finance options — no obligation.