If you live in a flat, you can still benefit from solar. The most effective route is a society-owned rooftop plant on the common-area connection, which gets a PM Surya Ghar subsidy of ₹18,000 per kW and lowers every resident's maintenance charge. Where a society agrees, individual flat owners can also install on an allotted share of the roof with their own net meter.
Key Takeaways
- Route 1 — society plant on the common-area meter: ₹18,000/kW subsidy up to 500 kW, savings shared by all.
- Route 2 — individual flat system on an allotted roof share, with society permission and your own DISCOM consumer number.
- Route 3 — small balcony or wall-mounted panels: limited output, mainly for top-floor or corner flats.
- A 100-flat society's lifts, pumps and lights often cost ₹40,000–80,000 a month — the biggest saving opportunity.
- Start with the managing committee: a resolution, roof survey and bills are the first three steps.
Why flats are different
An independent house owner owns the roof and the connection; a flat owner usually owns neither the roof nor the common services. The terrace belongs to all residents, and lifts, water pumps, corridor and compound lights, the gate, CCTV and the clubhouse run on a separate common-area connection whose bill is split through maintenance charges. Any rooftop solar on an apartment building therefore needs the society's agreement — and the most natural thing for solar to power is that common meter.
Route 1 — a society-owned plant (recommended)
A plant on the terrace connected to the common-area meter offsets exactly the load that every resident pays for. Under PM Surya Ghar, group housing societies and RWAs get ₹18,000 per kW for common-facility systems up to 500 kW. The numbers for a typical 100-flat society in Bhopal, Gwalior or Bilaspur:
| Item | 25 kW society plant |
|---|---|
| Installed cost | ≈ ₹12.5–13.5 lakh |
| Subsidy (₹18,000 × 25) | ₹4,50,000 |
| Net cost to society | ≈ ₹8–9 lakh — about ₹8,000–9,000 per flat |
| Annual generation | ≈ 36,000–38,000 units |
| Annual saving on common bill | ≈ ₹3–3.5 lakh — about ₹3,000–3,500 per flat per year |
| Payback | ≈ 2.5–3 years |
The plant can be funded from the sinking fund, a one-time contribution, or a bank loan whose instalment is covered by the saving.
Route 2 — your own system on a share of the roof
Some societies divide terrace space among top-floor or all flats, letting individual owners install their own systems connected to their own meters. For this you need: a written NOC from the society allotting a defined roof area; a direct DISCOM consumer number in your name; a cable route from the terrace to your meter; and enough area — about 100 sq ft per kW, so 300 sq ft for a 3 kW system. Such a system is treated like any home installation: net-metered through MPMKVVCL, MPPKVVCL or CSPDCL and eligible for the individual PM Surya Ghar subsidy of up to ₹78,000. In practice this works best in low-rise buildings with few flats and a large terrace.
Route 3 — balcony or wall panels
A south-facing balcony railing or wall can hold one or two panels feeding a small inverter. Output is modest — a 1 kW balcony array on a well-oriented wall may give 80–110 units a month — and shading from upper floors often cuts it further. It can make sense for top-floor or corner flats with good exposure, but it is not a substitute for a proper rooftop system.
How to get your society started
- Collect twelve months of common-area bills from the treasurer.
- Request a free roof survey — usable area, shading from tanks and lift rooms, waterproofing condition, structure.
- Get a written proposal showing size, cost, subsidy, saving and per-flat figures.
- Pass a committee or general-body resolution approving the project and funding.
- Apply — Sunvera files the PM Surya Ghar application in the society's name and the DISCOM net-metering application.
- Install and commission — typically one to two weeks on site for 25–50 kW.
Common objections, answered
- "We use the terrace." Elevated structures keep the space usable underneath for drying clothes or gatherings.
- "It will cause leaks." Ballasted or properly sealed mounts avoid damaging waterproofing; fix existing leaks before installation.
- "Who maintains it?" An AMC covers cleaning and inspection; the cost is small next to the saving.
- "Top-floor residents will get extra heat." Panels actually shade the roof slab and reduce heat gain below.
How the saving reaches each flat
A society plant does not put money directly into residents' pockets; it lowers the common-area electricity bill, which is part of the monthly maintenance charge. Committees usually do one of three things with the saving: reduce maintenance charges, build up the sinking fund for repairs, or repay the loan used to fund the plant until it is cleared and then reduce charges. Whichever route is chosen, the generation and bill figures should be reported at each general body meeting — the inverter's monitoring app makes this simple — so every resident can see what the plant is delivering.
Builders and new projects
For buildings still under construction, adding solar at the design stage is far easier and cheaper: structure anchors and cable routes are planned into the terrace, the common-area connection is sized for net metering from day one, and the plant is commissioned before residents move in. Developers in Gwalior, Bhopal and Bilaspur increasingly list rooftop solar as an amenity; Sunvera works with builders on design-stage integration so the society inherits a working plant rather than a retrofit project.
Talk to us
Sunvera Energy has prepared society proposals and filed applications in RWAs' names in Gwalior and Bhopal. Send your society's common-area bills and a terrace photo to +91 77103 07937 for a committee-ready proposal with per-flat figures.
Frequently Asked Questions
Yes, in three ways: a society-owned plant on the common-area meter, your own system on an allotted share of the roof with society permission and a direct DISCOM connection, or a small balcony array. The society plant is usually the most effective option.
Under PM Surya Ghar, group housing societies and RWAs get ₹18,000 per kW for common-facility systems up to 500 kW. A 25 kW plant therefore receives ₹4,50,000, bringing the net cost to about ₹8–9 lakh.
Yes, if the flat has a direct DISCOM consumer number in the owner's name and the system is installed on an allotted roof share with a society NOC. It is then treated like any home installation and net-metered to the flat's meter.
A 25 kW plant on a 100-flat society's common-area connection typically saves ₹3–3.5 lakh a year — about ₹3,000–3,500 per flat — with a payback of around 2.5–3 years after the subsidy.
Get a free site survey & PM Surya Ghar subsidy guidance.