Commercial solar installation pays back faster than any other kind of rooftop solar, because businesses buy electricity at ₹8–11 a unit and use most of it in daylight — exactly when the panels generate. Sunvera Energy designs and installs 10–100 kW on-grid and hybrid plants for shops, offices, schools, hospitals, hotels and petrol pumps across Madhya Pradesh and Chhattisgarh, from offices at Pichhore (Shivpuri), Gwalior, Balaghat and Bilaspur. A typical 25 kW plant costs ₹12.5–13.5 lakh, saves ₹3–3.5 lakh a year and pays back in three to four years, before the accelerated-depreciation benefit.

Why commercial solar pays back so quickly

Two things decide a solar plant's return: the price of each unit it replaces, and how much of its output is used on site. Commercial buildings win on both. A home on the upper domestic slab saves ₹6–7 a unit; a showroom, clinic or office on a commercial tariff saves ₹8–11. And because shops, offices, schools and hospitals run their AC, lighting, computers and equipment during working hours, 80–95 per cent of a well-sized plant's generation is consumed directly instead of being exported to the grid at a lower rate.

The result: a 25 kW plant in Gwalior, Bilaspur or Shivpuri generating about 36,000–38,000 units a year offsets ₹3–3.5 lakh of electricity annually against an installed cost of ₹12.5–13.5 lakh — a simple payback of three to four years, and more than twenty years of near-free power after that.

Commercial solar by segment

SegmentTypical sizeWhy it worksDesign note
Shops & showrooms5–15 kWAC and lighting run exactly in business hoursElevated structure where roof is shared
Offices & banks10–30 kWEntire load falls in sunlight hoursThree-phase on-grid
Schools & colleges25–100 kWClassrooms, labs, fans through the school dayInstall in vacation; no disruption
Hospitals & clinics10–100 kWCritical loads and costly diesel backupHybrid with lithium battery for critical circuits
Hotels & resorts15–50 kWAC, kitchens, laundry, water heatingHybrid in outage-prone areas (e.g. Bandhavgarh)
Petrol pumps10–20 kWDispensers, canopy lights, 24-hour storeCanopy-mounted structure

Sunvera has completed a 10 kW hybrid system for a hospital in Gwalior and a 75 kW warehouse plant in Bilaspur, and handles commercial projects across all 22 districts it serves.

Commercial solar price list (2026)

CapacityRoof neededInstalled priceAnnual generationAnnual saving (₹8.5/unit)Simple payback
10 kW1,000 sq ft₹5,50,000–6,00,00014,500–15,000 units≈ ₹1,25,000≈ 4.5 yrs
25 kW2,500 sq ft₹12,50,000–13,50,00036,000–38,000 units≈ ₹3,15,000≈ 4 yrs
50 kW5,000 sq ft₹22,50,000–25,00,00072,000–75,000 units≈ ₹6,25,000≈ 3.8 yrs
100 kW10,000 sq ft₹45,00,000–50,00,0001,45,000–1,50,000 units≈ ₹12,50,000≈ 3.8 yrs

Prices include tier-1 panels from Waaree, Adani or Tata, three-phase string inverters, galvanised or non-penetrative structure, Polycab/Havells cabling, protection, installation, commissioning and the full DISCOM net-metering process. Per-kW cost falls as capacity rises. Payback figures are before tax; accelerated depreciation on the plant shortens the effective payback for profit-making businesses — confirm the current rate and your eligibility with your chartered accountant.

Sizing a commercial plant — the right way

The commonest mistake in commercial solar is filling the roof. Net metering credits exported units, but any annual surplus is settled at a DISCOM rate far below the commercial tariff, so a plant bigger than the daytime load earns less per kW. Sunvera sizes from twelve months of bills and, where available, the meter's load profile: the target is a plant whose output is almost entirely consumed between 9 am and 5 pm. For a school that closes in summer, the size reflects the vacation months; for a hotel with high evening load, a hybrid design shifts some daytime generation into the evening. The proposal shows expected self-consumption alongside generation, so the saving figure is honest.

Net metering and approvals for businesses

Commercial and institutional consumers can net-meter rooftop systems up to their sanctioned load under the MPERC (Madhya Pradesh) and CSERC (Chhattisgarh) regulations. The application goes to MPMKVVCL, MPPKVVCL or CSPDCL with a single-line diagram, load details, the inverter's grid-compliance certificate and the institution's authorisation; above certain capacities a chartered electrical inspector's approval is also required. Sunvera prepares the full file, coordinates the inspection and follows up with the division until the bi-directional meter is installed — typically four to eight weeks for commercial projects. Businesses are not eligible for the PM Surya Ghar subsidy; housing societies and RWAs, which are, are covered on the residential solar page.

What the project looks like

  1. Bill and load review — twelve months of bills; preliminary size and price within a day.
  2. Site survey — roof area and structure, shading, meter room, cable route, earthing; free.
  3. Proposal — named components, generation and self-consumption estimate, price, payback, finance options.
  4. Approvals — DISCOM feasibility, electrical inspector where required.
  5. Installation — 3–10 working days depending on size, scheduled around business hours.
  6. Commissioning — testing, DISCOM inspection, net meter, handover with monitoring access.
  7. O&M — optional AMC with scheduled cleaning, quarterly generation review and priority breakdown support.

Call +91 77103 07937 or send your last twelve bills on WhatsApp for a preliminary commercial proposal.

Frequently Asked Questions

Get a free site survey

Written generation estimate, exact price after subsidy and bank-finance options — no obligation.