Commercial solar installation pays back faster than any other kind of rooftop solar, because businesses buy electricity at ₹8–11 a unit and use most of it in daylight — exactly when the panels generate. Sunvera Energy designs and installs 10–100 kW on-grid and hybrid plants for shops, offices, schools, hospitals, hotels and petrol pumps across Madhya Pradesh and Chhattisgarh, from offices at Pichhore (Shivpuri), Gwalior, Balaghat and Bilaspur. A typical 25 kW plant costs ₹12.5–13.5 lakh, saves ₹3–3.5 lakh a year and pays back in three to four years, before the accelerated-depreciation benefit.
Why commercial solar pays back so quickly
Two things decide a solar plant's return: the price of each unit it replaces, and how much of its output is used on site. Commercial buildings win on both. A home on the upper domestic slab saves ₹6–7 a unit; a showroom, clinic or office on a commercial tariff saves ₹8–11. And because shops, offices, schools and hospitals run their AC, lighting, computers and equipment during working hours, 80–95 per cent of a well-sized plant's generation is consumed directly instead of being exported to the grid at a lower rate.
The result: a 25 kW plant in Gwalior, Bilaspur or Shivpuri generating about 36,000–38,000 units a year offsets ₹3–3.5 lakh of electricity annually against an installed cost of ₹12.5–13.5 lakh — a simple payback of three to four years, and more than twenty years of near-free power after that.
Commercial solar by segment
| Segment | Typical size | Why it works | Design note |
|---|---|---|---|
| Shops & showrooms | 5–15 kW | AC and lighting run exactly in business hours | Elevated structure where roof is shared |
| Offices & banks | 10–30 kW | Entire load falls in sunlight hours | Three-phase on-grid |
| Schools & colleges | 25–100 kW | Classrooms, labs, fans through the school day | Install in vacation; no disruption |
| Hospitals & clinics | 10–100 kW | Critical loads and costly diesel backup | Hybrid with lithium battery for critical circuits |
| Hotels & resorts | 15–50 kW | AC, kitchens, laundry, water heating | Hybrid in outage-prone areas (e.g. Bandhavgarh) |
| Petrol pumps | 10–20 kW | Dispensers, canopy lights, 24-hour store | Canopy-mounted structure |
Sunvera has completed a 10 kW hybrid system for a hospital in Gwalior and a 75 kW warehouse plant in Bilaspur, and handles commercial projects across all 22 districts it serves.
Commercial solar price list (2026)
| Capacity | Roof needed | Installed price | Annual generation | Annual saving (₹8.5/unit) | Simple payback |
|---|---|---|---|---|---|
| 10 kW | 1,000 sq ft | ₹5,50,000–6,00,000 | 14,500–15,000 units | ≈ ₹1,25,000 | ≈ 4.5 yrs |
| 25 kW | 2,500 sq ft | ₹12,50,000–13,50,000 | 36,000–38,000 units | ≈ ₹3,15,000 | ≈ 4 yrs |
| 50 kW | 5,000 sq ft | ₹22,50,000–25,00,000 | 72,000–75,000 units | ≈ ₹6,25,000 | ≈ 3.8 yrs |
| 100 kW | 10,000 sq ft | ₹45,00,000–50,00,000 | 1,45,000–1,50,000 units | ≈ ₹12,50,000 | ≈ 3.8 yrs |
Prices include tier-1 panels from Waaree, Adani or Tata, three-phase string inverters, galvanised or non-penetrative structure, Polycab/Havells cabling, protection, installation, commissioning and the full DISCOM net-metering process. Per-kW cost falls as capacity rises. Payback figures are before tax; accelerated depreciation on the plant shortens the effective payback for profit-making businesses — confirm the current rate and your eligibility with your chartered accountant.
Sizing a commercial plant — the right way
The commonest mistake in commercial solar is filling the roof. Net metering credits exported units, but any annual surplus is settled at a DISCOM rate far below the commercial tariff, so a plant bigger than the daytime load earns less per kW. Sunvera sizes from twelve months of bills and, where available, the meter's load profile: the target is a plant whose output is almost entirely consumed between 9 am and 5 pm. For a school that closes in summer, the size reflects the vacation months; for a hotel with high evening load, a hybrid design shifts some daytime generation into the evening. The proposal shows expected self-consumption alongside generation, so the saving figure is honest.
Net metering and approvals for businesses
Commercial and institutional consumers can net-meter rooftop systems up to their sanctioned load under the MPERC (Madhya Pradesh) and CSERC (Chhattisgarh) regulations. The application goes to MPMKVVCL, MPPKVVCL or CSPDCL with a single-line diagram, load details, the inverter's grid-compliance certificate and the institution's authorisation; above certain capacities a chartered electrical inspector's approval is also required. Sunvera prepares the full file, coordinates the inspection and follows up with the division until the bi-directional meter is installed — typically four to eight weeks for commercial projects. Businesses are not eligible for the PM Surya Ghar subsidy; housing societies and RWAs, which are, are covered on the residential solar page.
What the project looks like
- Bill and load review — twelve months of bills; preliminary size and price within a day.
- Site survey — roof area and structure, shading, meter room, cable route, earthing; free.
- Proposal — named components, generation and self-consumption estimate, price, payback, finance options.
- Approvals — DISCOM feasibility, electrical inspector where required.
- Installation — 3–10 working days depending on size, scheduled around business hours.
- Commissioning — testing, DISCOM inspection, net meter, handover with monitoring access.
- O&M — optional AMC with scheduled cleaning, quarterly generation review and priority breakdown support.
Call +91 77103 07937 or send your last twelve bills on WhatsApp for a preliminary commercial proposal.
Frequently Asked Questions
Typically three to four years for shops, offices, schools and hospitals on commercial tariffs of ₹8–11 per unit, because most of the generation is used on site during working hours. A 25 kW plant at ₹12.5–13.5 lakh saves about ₹3–3.5 lakh a year. Accelerated depreciation shortens the effective payback further for businesses.
About ₹5.5–6 lakh for 10 kW, ₹12.5–13.5 lakh for 25 kW, ₹22.5–25 lakh for 50 kW and roughly ₹45,000–50,000 per kW at 100 kW, installed by Sunvera with tier-1 panels, inverters, structure, cabling and net-metering paperwork included.
No — PM Surya Ghar is for residential connections and housing-society common areas only. Businesses instead claim accelerated depreciation on the solar plant, which reduces taxable profit in the early years; your chartered accountant can confirm the current rate and eligibility.
Hybrid, for the critical circuits. A lithium battery bank switches ICU equipment, lighting and medicine refrigeration over in under 20 milliseconds during an outage, replacing diesel for most cuts while the system still earns net-metering credits. Sunvera has installed a 10 kW hybrid system for a Gwalior hospital on this design.
Size to the daytime load, not the roof. Self-consumed units save the full commercial tariff; exported surplus is settled at a much lower rate. Sunvera sizes from twelve months of bills and shows expected self-consumption in the proposal so the saving figure is realistic.
Installation itself takes 3–10 working days depending on size, scheduled around business hours. With DISCOM feasibility, electrical-inspector approval where required, and net metering, the whole project usually takes four to eight weeks.
Written generation estimate, exact price after subsidy and bank-finance options — no obligation.