☀ PM Surya Ghar Registered EPC
Residential Solar

Residential Solar Installation — Rooftop Solar for Homes

Residential solar installation by Sunvera Energy means a grid-connected rooftop system of 2–5 kW sized from your last twelve electricity bills, installed in one to two days with Waaree, Adani or Tata DCR panels, connected through your DISCOM's net meter and claimed under PM Surya Ghar for up to ₹78,000 — all by one PM Surya Ghar registered team working from offices at Pichhore (Shivpuri), Gwalior, Balaghat and Bilaspur. A 3 kW system costs about ₹2,00,000, or roughly ₹1,22,000 after subsidy, and typically takes a ₹2,000–2,700 monthly bill down to the fixed charge.

Which size does your home need?

Sunvera sizes a residential system from consumption, not from the subsidy cap or the roof area. Add up the units on your last twelve bills and divide by 1,500 — the annual generation of 1 kW in Madhya Pradesh and Chhattisgarh. The table shows what that means for typical homes:

HomeMonthly billAnnual unitsSystemMonthly generation
1–2 BHK, fans, fridge, TV, no AC₹800–1,5001,500–2,5001–2 kW120–260 units
2–3 BHK, one 1.5-ton AC₹2,000–2,7003,500–4,8003 kW360–400 units
3 BHK / independent house, two ACs₹3,500–4,5006,000–7,8005 kW600–650 units
Large house, 3+ ACs, geyser, pump₹6,000+10,000+7–10 kW (three-phase)850–1,250 units

Oversizing wastes money: surplus units beyond your annual consumption are paid at a low DISCOM rate, not the retail tariff you save. Undersizing leaves the costliest slab units on your bill. If a second AC is planned within two years, size for it now.

What a Sunvera residential system includes

  • DCR solar panels — 540–580 Wp mono-PERC or TOPCon modules from Waaree, Adani or Tata, 25-year performance warranty, eligible for subsidy.
  • Grid-tied inverter — single-phase up to 5 kW, three-phase above, with a monitoring app that shows daily generation on your phone.
  • Hot-dip galvanised structure — tilted 20–25° south; elevated versions keep the roof usable underneath.
  • Protection and cabling — Polycab/Havells DC and AC cables, DC and AC distribution boxes, surge protection, earthing and a lightning arrester.
  • Net-meter paperwork — application, feasibility, inspection and bi-directional meter through MPMKVVCL, MPPKVVCL or CSPDCL.
  • PM Surya Ghar claim — portal registration through subsidy credit, filed under Sunvera's registered vendor ID.
  • Commissioning report and training — a written test report, and a walk-through of the app, cleaning and what to do in a fault.

Residential solar price and subsidy

SystemInstalled pricePM Surya Ghar subsidyNet costAnnual saving*Payback
2 kW₹1,40,000–1,50,000₹60,000≈ ₹85,000≈ ₹18,000≈ 4.5–5 yrs
3 kW≈ ₹2,00,000₹78,000≈ ₹1,22,000≈ ₹27,000≈ 4–4.5 yrs
5 kW≈ ₹3,00,000₹78,000≈ ₹2,22,000≈ ₹50,000≈ 4–4.5 yrs

*At the upper domestic slab of ₹6–7 per unit. Prices include everything in the list above; they move with module prices and GST, so the written quotation after the survey is final. Concessional PM Surya Ghar loans up to ₹2 lakh for systems to 3 kW are arranged through SBI, HDFC Bank, PNB and Bank of Baroda — the EMI on 3 kW over seven years is about ₹2,000 a month, usually below the bill it replaces.

On-grid, hybrid or off-grid for a home?

On-grid is right for nine homes in ten: the lowest cost per kW, subsidy-eligible, and net metering means the grid acts as your battery — surplus exported by day is credited against night-time use. It switches off during a power cut for linemen's safety.

Hybrid adds a lithium battery so selected circuits — fans, lights, fridge, Wi-Fi, one AC — keep running through outages, while still earning net-metering credits. It costs 40–60 per cent more; worth it in districts like Kondagaon, Dindori or rural Shivpuri where cuts are long, not for a city home with a stable supply.

Off-grid has no grid connection and no subsidy; it suits farmhouses and sites the DISCOM does not reach.

Flats and housing societies

An individual flat can install on its own roof share only with the society's written permission and a direct DISCOM consumer number. The better route for most apartment buildings is a society system on the common-area connection — lifts, pumps, lighting — which gets ₹18,000 per kW under PM Surya Ghar up to 500 kW and lowers every resident's maintenance charge. Sunvera prepares the committee resolution, the single-line diagram and the DISCOM application in the society's name, and has handled this for RWAs in Gwalior and Bhopal.

Roof, shade and other things the survey checks

A 3 kW system needs about 300 sq ft of shade-free roof — six panels of roughly 7.5 × 3.7 ft. The free site survey measures the usable area, maps shadows from water tanks, parapets and neighbouring buildings through the day, checks the roof's condition (RCC, tin sheet and tiled roofs all work, with different structures), locates the meter and the cable route, and confirms the sanctioned load — many older connections are 1–2 kW and need an enhancement, which Sunvera files alongside the net-metering application. You get a written proposal within two or three days of the survey.

Living with the system

Rinse the panels every two to three weeks in the dry months — dust costs 5–8 per cent a month — and leave the monsoon to do it in July and August. Check the app once a week; a sudden drop means shade, a tripped string or an inverter fault, and Sunvera's service team comes from the nearest office. Panels degrade about 0.5 per cent a year; the inverter is the one component likely to be replaced once in 25 years, around year 10–12. An optional AMC covers scheduled cleaning, inspection and priority breakdown support. Call +91 77103 07937 or walk into any office — Pichhore, Gwalior, Balaghat or Bilaspur — with your bills to start.

Frequently Asked Questions

Get a free site survey

Written generation estimate, exact price after subsidy and bank-finance options — no obligation.