Solar installation and commissioning in Shivpuri is carried out by Sunvera Energy's own team from the head office at Pichhore — not passed to a subcontractor. A typical 3 kW home system in Shivpuri town goes up in a single day and is tested before the team leaves; MPMKVVCL inspection and the net meter usually follow within three to five weeks, and then the ₹78,000 central subsidy is processed. The team works on flat RCC roofs in the town, old stone-slab roofs in the bazaar lanes and villages, and sheet roofs on shops and godowns, with the mounting method chosen for each.
Three kinds of Shivpuri roof
Flat RCC roofs, common in Shivpuri town and the newer colonies, take a hot-dip galvanised structure anchored into the slab with chemical anchors and sealed so the roof does not leak. Stone-slab roofs — the long sandstone patti roofs seen on older houses around Sadar Bazaar and Gandhi Chowk and in many villages — are strong along the beams but the slabs themselves can crack if drilled carelessly, so the structure is fixed on the beams or held down with ballast blocks instead. Sheet roofs on shops, godowns and farm buildings use clamp-on rails that grip the sheet profile without drilling through it. The survey decides the method, and it is written into your quotation.
Before installation day
Once you accept the quotation, Sunvera registers your application on the PM Surya Ghar portal and files the feasibility request with MPMKVVCL. If your sanctioned load is lower than the planned system, the load increase is applied for at the same time. Approval usually takes one to three weeks. Meanwhile the panels, inverter, structure and cables are allotted to your job, and the serial numbers of the DCR panels are recorded for the subsidy file.
Installation day
The team arrives early to finish the heavy roof work before the Shivpuri sun gets fierce. The structure is fixed and levelled facing south at a tilt suited to the district's latitude, with an air gap under the panels so they run cooler in summer. Panels are mounted and wired in strings with UV-resistant solar cable in conduit. The inverter goes on a shaded, ventilated wall close to the meter, with DC and AC protection boxes beside it. Earth pits are dug and a lightning arrester fitted on the highest point. For two-storey houses, material is lifted with ropes and pulleys and cables run neatly down the building.
Tests before we leave
- Open-circuit voltage and current of each string, compared with each other.
- Polarity and insulation resistance of the DC wiring.
- Resistance of each earth pit.
- Breakers, fuses and surge protection devices working correctly.
- Inverter start-up and synchronisation with the grid.
- Output under load and the monitoring app showing live generation.
The results are written down and handed to you with the warranty cards, and the family is shown how to read the app and switch off safely.
Commissioning with MPMKVVCL
After installation, Sunvera uploads the photos, panel serial numbers and inverter details on the portal and requests inspection from the MPMKVVCL office. When the inspection is approved, the bi-directional net meter is fitted and the commissioning report is generated — typically three to five weeks after installation. Your bank details are then submitted for the ₹78,000 central subsidy, which normally reaches your account within about a month. Until the net meter arrives the system is switched on only as the rules allow, and the team explains this on the day.
Book an installation
Visit the head office at Rannod Road, Bijasen Mandir Colony, Pichhore, or call +91 77103 07937. With zero down payment and 100% loan finance available, a home in Shivpuri town, Kolaras, Badarwas, Pohri, Narwar or Karera can have its system installed within a few weeks of the first visit.
Frequently Asked Questions — Solar in Shivpuri
A home system of 3 to 5 kW is usually installed in a single day by Sunvera Energy's own team. The full process, from feasibility approval to MPMKVVCL inspection, net meter and commissioning report, typically takes six to ten weeks in Shivpuri district.
Yes. Stone-slab roofs are strong along the beams, but the slabs can crack if drilled carelessly. Sunvera fixes the structure on the beams or uses ballast blocks to hold it down, and checks the roof condition during the survey before recommending the method.
String voltage and current, DC polarity and insulation resistance, earth pit resistance, breakers and surge protection, inverter start-up and grid synchronisation, and output under load. The results are written down and handed over with the warranty cards and the monitoring app set up.
Usually three to five weeks after installation. Sunvera uploads the installation details, requests inspection from MPMKVVCL and follows up until the bi-directional net meter is fitted and the commissioning report is generated, after which the subsidy is claimed.
No. Installations in Shivpuri district are done by Sunvera Energy's own trained team from the head office at Pichhore, the same people who handle after-sales service. There is no travel charge for installation anywhere in the district.
Written generation estimate, exact price after subsidy and bank-finance options — no obligation.