A solar energy audit in Gwalior starts from the biggest fact about the city's electricity use: the summer AC load. A family that uses 300 units in January may use 900 in June, and a system sized from either month alone will be wrong. Our audit reads twelve months of MPMKVVCL bills, checks the sanctioned load and phase, surveys the roof for space, shade and strength, and gives you the right size, expected units, real saving and payback in writing. For shops, hospitals, schools and Malanpur factories it adds load, shift and demand analysis. Sunvera Energy carries out audits across Gwalior from its office at Kampoo.
What we read on your bill
- Units each month: the real gap between winter and summer use.
- Sanctioned load and phase: net-metering capacity is generally limited to the sanctioned load, and larger systems need three-phase supply.
- Tariff category: domestic, non-domestic or industrial — this decides saving per unit and whether the ₹78,000 subsidy applies.
- Fixed charges and duty: they stay after solar, so we never promise a zero bill.
- Name and arrears: sorted before the PM Surya Ghar application.
The AC question
A 1.5-ton inverter AC used through a Gwalior summer adds roughly 700–900 units a year. Three ACs can double a home's yearly use. We separate this seasonal load from the base load, then size the system so that summer savings are large without sending big winter surpluses to the grid at a lower settlement rate. If you plan another AC or a new floor, we include it — adding capacity later costs more than planning it now.
On the roof
We measure usable area, mark tanks, stair rooms and parapets, and check shade at the low winter sun from taller neighbouring buildings, which is common in Lashkar and around Maharaj Bada. Old buildings with stone-slab or lime-plastered roofs are checked for strength and leaks before anything is fixed. We plan inverter placement in shade and cable routes away from monkeys and pigeons.
The business audit
For shops, hospitals, schools and factories, we study twelve months of bills for demand charges and power factor penalties, list major loads and their hours, and match solar output to the daytime base load. A showroom in City Centre open 10 am to 9 pm, a nursing home in Morar running around the clock and a Malanpur unit running two shifts need very different plants. We also check sheet-roof structures, inverter space and the MPMKVVCL approval route.
Two typical Gwalior results
A Thatipur home with three ACs used 7,300 units last year, on a three-phase 5 kW connection with 520 sq ft of free roof. Result: 5 kW, about ₹1.97–2.22 lakh after subsidy, saving ₹45,000–50,000 a year. A Lashkar home with one AC used 4,300 units, on a single-phase 3 kW connection with a crowded roof. Result: 3 kW on an elevated frame over the tank, about ₹1.02–1.22 lakh after subsidy, saving ₹26,000–30,000.
What you receive
| Item | Home | Business |
|---|---|---|
| Recommended size and layout | Yes | Yes, with roof drawings |
| Units month by month | Yes | Yes |
| Saving and payback | After subsidy | With a depreciation note for your CA |
| Phase, load and demand advice | Basic | Detailed |
| Approval steps | PM Surya Ghar and MPMKVVCL | MPMKVVCL and electrical inspector |
When the honest answer is "smaller" or "not yet"
Sometimes the audit says a smaller system, fixing the roof first, or waiting. Homes using under 100 units a month, roofs shaded for half the day, and buildings needing waterproofing are the usual cases. We say so plainly. To start, WhatsApp twelve months of bills to +91 77103 07937 or visit our Kampoo office.
Frequently Asked Questions — Solar in Gwalior
A study of your electricity use, roof and connection before buying solar. We read twelve months of MPMKVVCL bills, check sanctioned load, phase and tariff, survey the roof for space, shade and strength, and give you the right size, expected units, saving and payback in writing.
For homes in Gwalior, the bill study and roof survey are free. For hospitals, large schools and Malanpur factories that need detailed load and power-factor analysis, we quote the audit first, and the fee is usually adjusted if you go ahead with the plant.
Because June is the peak AC month in Gwalior. Sizing from it gives a system too large for the rest of the year, and surplus units are settled at a lower rate. Twelve months of bills give the right balance.
Usually only above about 5 kW. Many old-city homes are single-phase, which suits systems up to about 5 kW. The audit checks your phase and sanctioned load and plans any change with MPMKVVCL.
Yes. If your use is very low, the roof is heavily shaded, or the roof needs repair, we say so and suggest a smaller system, a repair first or waiting until your use grows.
Written generation estimate, exact price after subsidy and bank-finance options — no obligation.