Energy Audit & Consultancy

Solar Energy Audit & Feasibility Study

A solar energy audit answers the question before the investment: how much electricity do you really use, when, on what, and how much of it can solar replace? Sunvera Energy's energy audit and feasibility study examines your bills and load pattern, finds efficiency savings that cost less than any solar panel, checks the roof and connection, and recommends the right system size and type — on-grid, hybrid or off-grid — with an honest payback. It is the first step for factories, mills, hospitals, schools, offices and large homes across Madhya Pradesh and Chhattisgarh.

Why audit before you buy solar

The commonest solar mistake is sizing by guesswork — "fill the roof" or "same as the neighbour". For a business, that can mean a plant whose output on Sundays and holidays is exported at a low settlement rate, or one too small for the daytime load. A second mistake is buying generation to feed waste: an old pump running inefficiently, ACs set at 18 °C, or lights left on in empty areas. Every unit saved through efficiency is cheaper than a unit generated by solar. An audit puts both on the table, so the solar plant is sized to a clean, efficient load and every kilowatt earns its keep.

What the audit covers

AreaWhat is examined
Bill analysisTwelve months of units, tariff category, demand charges, power factor, penalties, seasonal swings
Load profileMeter load data where available; spot measurements of major equipment; daytime vs night share
Major loadsMotors, pumps, compressors, ACs, chillers, lighting, process equipment — age, efficiency, running hours
Efficiency opportunitiesLED retrofits, AC set-points and maintenance, pump and motor right-sizing, power-factor correction, timers
Roof and siteUsable area, structure capacity, shading across seasons, access and cable routes, ground-mount options
Connection and rulesSanctioned load, phase, DISCOM (MPMKVVCL, MPPKVVCL or CSPDCL) and applicable net-metering or captive rules
Backup needsOutage history, critical loads, generator use — whether hybrid makes sense

Efficiency first — typical findings

  • Lighting — replacing tube lights and halogens with LEDs often halves lighting load.
  • Air-conditioning — raising set-points from 18–20 °C to 24–26 °C and cleaning filters and coils can cut AC consumption by 15–25 per cent.
  • Pumps and motors — oversized or rewound motors, throttled valves and leaking pipes waste energy; right-sizing pays back quickly.
  • Power factor — poor power factor on commercial and industrial connections can attract penalties; capacitor banks fix it.
  • Idle loads — compressors, lights and equipment left running after hours; simple timers solve much of it.

The audit report prices each measure and its saving, so the owner can decide what to do before, alongside or after solar.

The feasibility report

The final report gives a clear recommendation: system size and type, layout, components, expected monthly and annual generation, self-consumption share, installed cost, savings at your tariff, simple payback and, for businesses, the effect of accelerated depreciation. It flags anything that must happen first — a load enhancement, roof repair, structural strengthening or a connection transfer — and the approval path with your DISCOM. For hospitals, hotels and farms with frequent cuts, it compares on-grid and hybrid designs side by side.

Who needs a detailed audit

CustomerRecommended level
Home with a normal billFree bill-based assessment and site survey
Shop, clinic or small officeBill and load review with site survey
School, hospital, hotel, large officeDetailed audit including major loads and backup needs
Factory, rice mill, cold storageFull audit with load data, equipment review and month-by-month modelling

How the audit is done

  1. Data request — twelve months of bills, sanctioned load, equipment list, operating hours and any meter data.
  2. Site visit — walk-through of loads, measurements of major equipment, roof and structure assessment, shading study.
  3. Analysis — load profile, efficiency opportunities, solar sizing and generation modelling for your district.
  4. Report and discussion — a written report presented to the owner, management or committee, with questions answered.

Sunvera's engineers from Pichhore (Shivpuri), Gwalior, Balaghat and Bilaspur carry out audits across 22 districts. Call +91 77103 07937 to schedule one.

Industrial audits — demand and power quality

For factories and mills on industrial tariffs, the audit goes further. Maximum demand and contract demand are compared with actual peaks, because demand charges can be a large part of the bill and solar alone does not always reduce them. Power factor and harmonics from large motor drives are measured, since poor power quality attracts penalties and can affect inverter behaviour. Process loads are mapped by shift so the solar plant is sized to the daytime base load, and opportunities such as shifting non-urgent loads into solar hours are identified. The result is a plant design and an operating plan that together cut both energy and demand costs.

What you need to provide

  • Twelve months of electricity bills, or the consumer number to download them
  • Sanctioned load or contract demand and connection type
  • A list of major equipment with ratings and operating hours
  • Operating schedule — shifts, holidays, seasonal variations
  • Generator log and outage history where backup matters
  • Roof drawings or dimensions, if available

An example from a hospital audit

A 40-bed nursing home paying around ₹1.2 lakh a month asked for a 50 kW plant. The audit found most AC units set at 18 °C with clogged filters, old tube lighting throughout, and a borewell pump running much longer than needed because of a leaking overhead tank. Fixing these cut consumption by about 18 per cent. The recommended plant became 35 kW on-grid plus a 10 kW hybrid section for critical circuits — a smaller investment that covered a larger share of the remaining bill and added backup the original plan lacked. Figures vary by site; the point is that measuring first changes the answer.