☀ PM Surya Ghar Registered EPC
Chhattisgarh · North Chhattisgarh

Solar Installation and Commissioning in Korba — What Happens on Your Roof

Solar installation and commissioning in Korba is a short job on the roof and a longer wait for paperwork. A 3 kW home system is usually installed in a single day; testing and handover follow immediately; and CSPDCL inspection and the bi-directional net meter typically come three to five weeks later. This page explains what happens at each step, what quality checks to expect, and what you need to do — so families in Balco Nagar, Niharika, Kosabadi or Transport Nagar know exactly what they are paying ₹1,80,000–2,00,000 for, before the ₹1,08,000 of central and state subsidy is credited back.

Before installation day

The site survey measures the roof, maps shade from water tanks, stair rooms and neighbouring buildings, checks the roof slab, and confirms the meter, sanctioned load and that your connection is a direct CSPDCL residential connection. A layout is drawn and the quotation names every component. After registration on the PM Surya Ghar portal and CSPDCL feasibility, material is dispatched: DCR panels, inverter, structure, cables, protection boxes and earthing kits.

Installation day, step by step

  1. Structure — hot-dip galvanised frames anchored to the roof without breaking waterproofing, tilted towards the south.
  2. Panels — mounted and clamped, with serial numbers recorded for warranty and subsidy files.
  3. DC wiring — UV-resistant solar cable, proper MC4 connectors, routed in conduit.
  4. Protection — DC and AC distribution boxes with fuses, breakers and surge protection.
  5. Earthing — separate earth pits for the structure and electrical system, plus a lightning arrester.
  6. Inverter — mounted on a shaded, ventilated wall near the meter, connected and configured.
  7. Monitoring — the inverter is connected to Wi-Fi and the app set up on your phone.

Testing and handover

Before the system is switched on, each string's open-circuit voltage and current are measured and compared, so a faulty panel or loose connector is found on day one. Earth resistance is measured, protection devices are checked, and the inverter is run under load. At handover you receive the test results, the layout, warranty cards for panels and inverter, and a short explanation of the display and app — what normal generation looks like and what an error code means.

Commissioning with CSPDCL

Sunvera uploads installation details, photographs and serial numbers on the portal and applies for inspection. A CSPDCL official inspects the system, and after approval the bi-directional net meter is installed and the system is commissioned. This stage typically takes three to five weeks. Once the commissioning report is generated, bank details are submitted for the ₹78,000 central subsidy, and the ₹30,000 Chhattisgarh state subsidy follows its own procedure.

Built for Korba conditions

Korba roofs face hot summers, pre-monsoon storms and constant dust. That is why the structure is galvanised rather than painted, the array is earthed with a lightning arrester, surge protection is fitted on both DC and AC sides, and panels are placed so they can be reached safely for cleaning. Cable runs are kept short and tidy, and the inverter is placed out of direct sun so it runs cool.

What you need to do

Keep your electricity bill and Aadhaar ready, make sure the meter, applicant and bank account names match, clear the roof on installation day, and agree the inverter position. Everything else — portal, CSPDCL paperwork, inspection and subsidy follow-up — is handled by Sunvera from its Bilaspur office. Zero down payment with 100% loan finance is available. Call +91 77103 07937 to book a survey in Korba.

Frequently Asked Questions — Solar in Korba

Get a free site survey in Korba

Written generation estimate, exact price after subsidy and bank-finance options — no obligation.