The solar panel price in Pichhore is about ₹1,40,000–1,50,000 for a 2 kW home system and ₹2,00,000 for 3 kW installed, before the PM Surya Ghar subsidy of ₹60,000–78,000. Pichhore is where Sunvera Energy's head office stands, on Rannod Road in Bijasen Mandir Colony, so there is no travel line at all, and customers can walk in with their electricity bill and leave with a written quotation the same day. This page explains what goes into that quotation, why sanctioned load matters for village connections, and when in the year it pays most to install.
Prices for Pichhore homes
Homes in Pichhore town and the tehsil villages tend to be smaller users than in the cities. Many use 120–250 units a month in summer, which a 1–2 kW system covers; families with an AC or a large submersible go to 3 kW.
| Size | Installed | Subsidy | You pay | Suits |
|---|---|---|---|---|
| 1 kW | ≈ ₹78,000 | ₹30,000 | ≈ ₹48,000 | Lights, fans, fridge, TV |
| 2 kW | ₹1,40,000–1,50,000 | ₹60,000 | ≈ ₹85,000 | Add coolers and a pump |
| 3 kW | ≈ ₹2,00,000 | ₹78,000 | ≈ ₹1,22,000 | Add one AC |
What you get at the office
Because the head office is in town, Pichhore customers can see the actual equipment before buying — DCR panels, the inverter, galvanised structure sections, solar cable and the DC and AC protection boxes. Bring your latest bill and Aadhaar, and the team will:
- read the bill and recommend a size from your units, not a guess;
- check the sanctioned load printed on the bill;
- give a written quotation naming each component by make;
- register you on the PM Surya Ghar portal if you decide to go ahead;
- fix a survey date, usually within a day or two in town.
Sanctioned load on village connections
Many connections in Pichhore's villages were sanctioned at 1 kW years ago. Under the net-metering rules, the solar capacity generally cannot exceed the sanctioned load, so a family wanting 2 or 3 kW must first apply to MPMKVVCL for a load increase. Sunvera files that application together with the net-metering request; the DISCOM's own fees for load enhancement, where applicable, are shown separately so the system price stays clear.
Pumps for Pichhore farms
Around Pichhore, Dinara and Khaniyadhana, borewells and open wells serve wheat, groundnut and soybean fields. Pump size depends on depth, yield and field size, so it is quoted after a survey; as a rule, 3 HP suits shallow sources and small plots, 5 HP most holdings, and 7.5 HP deep borewells. Eligible farmers can apply under PM-KUSUM through MP Urja Vikas Nigam to reduce their share, and the head office team prepares the file.
The best time to install
Any month works, but installing between October and February has an advantage: winter generation is good while household use is low, so net metering banks surplus units that are then used in April–June, when coolers and pumps run hardest. Approvals take three to five weeks after installation, so a system ordered in winter is usually net-metered before the heat arrives. Call +91 77103 07937 or simply visit the office.
Frequently Asked Questions — Solar in Pichhore
About ₹78,000 for 1 kW, ₹1,40,000–1,50,000 for 2 kW and ₹2,00,000 for 3 kW installed, or roughly ₹48,000, ₹85,000 and ₹1,22,000 after the PM Surya Ghar subsidy. There is no travel line because Sunvera's head office is in Pichhore.
Yes. Bring your latest electricity bill and Aadhaar to the head office on Rannod Road, Bijasen Mandir Colony, Monday to Saturday. The team reads the bill, checks your sanctioned load and gives a written quotation the same day.
Not directly — the solar capacity generally cannot exceed the sanctioned load. You first apply to MPMKVVCL for a load increase. Sunvera files it alongside the net-metering request, and any DISCOM fee is shown separately in the quotation.
October to February. Winter generation is good while use is low, so net metering banks surplus for the summer. With three to five weeks for approvals, a winter installation is usually net-metered before April.
Yes — across Pichhore, Dinara and Khaniyadhana. Pumps are priced after a survey of water depth, yield and field size, and eligible farmers can reduce their share under PM-KUSUM through MP Urja Vikas Nigam.
Written generation estimate, exact price after subsidy and bank-finance options — no obligation.