☀ PM Surya Ghar Registered EPC
Commercial solar

Solar for Offices & Bank Branches

Solar for office buildings has an unusually clean case: the working day — 9:30 am to 6 pm, six days a week — sits almost entirely inside solar generation hours, so nearly every unit a rooftop system produces is used by the office's ACs, computers, servers and lighting at commercial tariff. Sunvera Energy installs 5–30 kW systems for professional offices, bank branches, coaching and IT offices, CA and law firms, and corporate branch offices across Madhya Pradesh and Chhattisgarh, with hybrid options to keep servers and networks running through outages.

Why offices are a near-perfect solar match

An office's load starts when staff arrive, peaks in the hot early afternoon as ACs work hardest, and falls away after closing. Rooftop solar rises from 8–9 am, peaks at midday and fades by 5 pm. The overlap is so close that on working days almost all generation is used on site, saving the full commercial tariff of ₹8–11 a unit. Only on Sundays and holidays is most of the output exported — credited through net metering and used during the next week's evenings and cloudy days. Few other building types match the solar curve this well.

Sizes and savings

Office typeTypical systemInstalled costAnnual generationAnnual saving at ₹9/unit
Small professional office (CA, lawyer, clinic admin)5 kW≈ ₹3,00,0007,200–7,500 units≈ ₹65,000
Bank or insurance branch10–15 kW₹5.5–8.5 lakh14,500–22,500 units≈ ₹1.3–2 lakh
Coaching or IT office, 50–100 staff15–25 kW₹8–13.5 lakh21,500–37,500 units≈ ₹2–3.3 lakh
Office block or regional office25–50 kW₹12.5–25 lakh36,000–75,000 units≈ ₹3.2–6.7 lakh

Prices include Waaree, Adani or Tata panels, inverter, structure, cabling, protection, installation, commissioning and DISCOM approvals. Businesses claim accelerated depreciation on the system.

Keeping IT and branch systems up

Most offices already have a UPS for computers and a DG set for long outages, and for many that is enough — an on-grid system then gives the best return. Where cuts are frequent, a hybrid design adds a lithium battery on a separate board for the server, network switches, CCTV, access control, a few workstations and, in banks, ATMs and core-banking terminals. The battery carries these through cuts in under 20 milliseconds, the UPS load drops, and the generator starts only for long outages. Battery size is set by the branch's actual outage log, not a rule of thumb. For most branches, 5–10 kWh covers the cuts that actually occur in a typical week.

Rented premises

Many offices and bank branches are tenants. A solar system is still practical with three things in place: a written NOC from the landlord allotting roof space; a cable route from the roof to the office's own meter; and a lease clause stating who owns the system and what happens at the end of the lease — removal and relocation, transfer to the landlord at an agreed value, or a lease extension. With a typical payback of about four years, a lease of five years or more makes the investment comfortable. Sunvera helps draft the NOC and plans the installation so it can be moved later if needed.

Bank branches — practical points

  • Approvals from the bank's premises or engineering department are usually needed in addition to the landlord's NOC; Sunvera provides the technical documents they ask for.
  • Security — inverters and isolators are placed inside secured areas, and cabling avoids strong-room walls.
  • Uptime — work is done after banking hours or on holidays; the electrical tie-in is scheduled with the branch manager.
  • Reporting — monthly generation reports help branches report energy savings to regional offices.

What the numbers look like for a bank branch

Take a branch in a district town using about 2,000 units a month — four split ACs, lighting, computers, a server room, two ATMs and CCTV — at an effective ₹9.5 a unit, or roughly ₹19,000 a month. A 12 kW system generating about 1,450–1,500 units a month covers around three-quarters of that, saving about ₹14,000 a month or ₹1.7 lakh a year, for an installed cost of roughly ₹6.5–7 lakh. Sundays and holidays export to the grid and are credited back during weekday evenings. Adding a 5–10 kWh battery for the server, network and ATMs raises the cost but lets the branch run its essential systems through short cuts without the generator, which many regional offices value for service continuity.

Small changes that multiply the saving

Set ACs to 24–26 °C, switch to LED lighting and enable sleep settings on computers and printers; these often cut consumption by 15–25 per cent, which lets a smaller solar system cover a larger share of the bill. Keep panels clean every two weeks in the dry season, especially in busy city areas with road dust, and glance at the monitoring app weekly. An AMC from Sunvera covers cleaning and inspection for offices that would rather not manage it themselves.

Getting started

Sunvera serves offices and branches across 22 districts of Madhya Pradesh and Chhattisgarh — MP Nagar in Bhopal, City Centre in Gwalior, Vyapar Vihar in Bilaspur and district headquarters from Shivpuri to Korba — from offices at Pichhore, Gwalior, Balaghat and Bilaspur. Send twelve months of bills, your working hours and a roof photo to +91 77103 07937 for a sized proposal, including the payback, the self-consumption estimate for your working week and any hybrid option.

Frequently Asked Questions

Get a free site survey

Written generation estimate, exact price after subsidy and bank-finance options — no obligation.