Industrial solar installation in Shivpuri cuts the biggest cost line of the district's working units: electricity. Stone cutting and polishing units, crushers, flour and dal mills, groundnut and mustard oil mills, cold storages, ice plants, pipe and brick works and the knitwear workshops of Badarwas all run motors through the day on MPMKVVCL industrial connections. A plant of 25 kW costs about ₹12.5–13.5 lakh, and plants of 50–100 kW about ₹45,000–50,000 per kW, with payback typically in four to five years. Sunvera Energy designs, installs and maintains these plants from its head office at Pichhore in Shivpuri district.
Shivpuri industries that suit solar
Stone units and crushers. Cutting, polishing and crushing machines run long daytime shifts. Their sheds are dusty, so plants are designed with a steeper tilt, a walkway for frequent cleaning and an O&M plan.
Flour, dal and oil mills. Mills processing wheat, gram, groundnut and mustard from the district's farms run motors from morning to evening, with peaks after harvest. Their wide sheet roofs hold 25–75 kW.
Cold storages and ice plants. Compressors run round the clock, so solar covers the daytime share and cuts the bill by a third or more. A hybrid section can protect controls during cuts.
Workshops and small manufacturing. Fabrication shops, pipe and brick works, printing presses and the knitwear workshops around Badarwas use 10–30 kW in working hours and pay back well.
Prices and output
| Plant size | Approx. price | Units a year |
|---|---|---|
| 10 kW | ≈ ₹5.5–6 lakh | 14,500–15,000 |
| 25 kW | ≈ ₹12.5–13.5 lakh | 36,250–37,500 |
| 50 kW | ≈ ₹22.5–25 lakh | 72,500–75,000 |
| 100 kW | ≈ ₹45–50 lakh | 1,45,000–1,50,000 |
For reference, Sunvera Energy's own 75 kW warehouse plant in Bilaspur generates roughly 1,05,000–1,15,000 units a year. The proposal for your unit is built from your twelve months of bills, your shift timings and your contract demand.
Sheet roofs, RCC roofs and open land
Most Shivpuri mills and workshops have galvanised or cement-sheet roofs. Panels are fixed with non-penetrative clamps on the sheet seams or on a light rail system, after checking the purlins can carry the extra load, so no new holes are drilled and the roof does not leak. RCC roofs take a ballasted or anchored galvanised structure. Units with spare land along the Gwalior or Jhansi roads can build a ground-mounted plant, which is easier to clean and leaves the roof untouched.
Approvals with MPMKVVCL
Rooftop capacity under net metering is generally limited by the sanctioned load or contract demand of the connection. Sunvera checks this first, prepares the single-line diagram and protection scheme, files the application with MPMKVVCL, arranges the meter testing and inspection, and commissions the plant only after approval. For HT connections there are additional steps, which we explain at the survey. Owners from the town, including traders near Sadar Bazaar and Court Road who also run mills, get one point of contact throughout.
Payback and finance
Industrial units pay a higher rate per unit than homes and use most of their power in daylight, so payback is typically four to five years and the plant keeps producing for 25 years or more with a 25–30 year panel warranty. Accelerated depreciation on the plant usually reduces income tax in the first years; your CA can confirm the figure. Term loans are available through our bank tie-ups. A plant under our O&M contract is checked daily against its expected output, so the savings in the proposal are the savings you see.
Book a site visit
Send your last twelve electricity bills and shift timings to +91 77103 07937 or visit the head office at Rannod Road, Bijasen Mandir Colony, Pichhore. The site visit, load study and proposal are free anywhere in Shivpuri district.
Frequently Asked Questions — Solar in Shivpuri
A 25 kW plant costs about ₹12.5–13.5 lakh, and plants of 50–100 kW about ₹45,000–50,000 per kW, so a 100 kW plant is roughly ₹45–50 lakh. Prices include structure, cabling, protection and the MPMKVVCL net-metering work; the final figure depends on roof type and site.
Yes. On galvanised or cement-sheet roofs we use non-penetrative clamps on the seams or a light rail system, after checking the purlins can carry the load. No new holes are drilled, so the roof does not leak in the monsoon.
Under net metering, rooftop capacity is generally limited by the sanctioned load or contract demand on your MPMKVVCL connection. We check this from your bill at the survey; if a larger plant makes sense, the load can be revised before the application.
Yes, with the right design. We use a steeper tilt so rain and rinsing carry dust away, leave walkways for frequent cleaning and add an O&M plan with extra cleaning rounds. The plant then stays close to its expected output despite the dust from cutting and crushing.
Typically four to five years. Units pay a higher tariff and run motors in daylight, so each solar unit replaces a costly grid unit. Accelerated depreciation usually lowers tax in the early years, and the plant keeps producing for 25 years or more.