An on grid solar system — also called grid-tied — connects your rooftop panels to the electricity grid through an inverter and a bi-directional net meter, so the power you generate by day runs your home or business and any surplus is credited against what you draw at night. It is the lowest-cost type of solar per kW and the only type eligible in full for the PM Surya Ghar subsidy of up to ₹78,000. Sunvera Energy installs on-grid systems from 1 kW to 500 kW across Madhya Pradesh and Chhattisgarh; a 3 kW home system costs about ₹2,00,000, or roughly ₹1,22,000 after subsidy.
How an on-grid solar system works
Panels on the roof produce DC electricity. The grid-tied inverter converts it to AC, synchronised to the grid's voltage and frequency, and feeds it into your building's wiring. Your appliances use solar power first. When panels produce more than you are using — midday on a sunny day — the surplus flows out to the grid and the bi-directional net meter records it as export. When you need more than the panels give — evenings, nights, cloudy hours — you import from the grid as usual. At the end of each billing cycle the DISCOM bills you only for the difference.
The inverter also watches the grid constantly. If supply fails, it shuts down within a fraction of a second — anti-islanding protection — so no solar power flows back into lines that linemen may be working on. That is why an on-grid system does not provide backup during a cut.
Net metering explained with numbers
Take a Shivpuri home with a 3 kW on-grid system in April. The panels generate about 15 units a day. The family uses 6 of those directly during the day and exports 9. In the evening and night they import 10 units from the grid. Over the day: 10 imported − 9 exported = 1 unit billed. Across a month, the bill falls from about ₹2,500 to little more than the fixed charge.
| Item | Per day | Per month |
|---|---|---|
| Solar generated | 15 units | ≈ 450 units |
| Used directly | 6 units | ≈ 180 units |
| Exported to grid | 9 units | ≈ 270 units |
| Imported from grid | 10 units | ≈ 300 units |
| Net billed | 1 unit | ≈ 30 units |
In the monsoon, generation falls and net imports rise; in spring the account runs the other way. Any surplus left at the end of the settlement year is paid at the DISCOM's approved rate, which is lower than the retail tariff — which is why systems should be sized to consumption, not to the roof.
On-grid solar system price (2026)
| Capacity | Suits | Installed price | Subsidy / benefit | Monthly generation |
|---|---|---|---|---|
| 1 kW | Small home, bill under ₹800 | ₹75,000–80,000 | ₹30,000 | 120–130 units |
| 2 kW | Home, bill ₹1,200–1,800 | ₹1,40,000–1,50,000 | ₹60,000 | 240–260 units |
| 3 kW | Home with one AC | ≈ ₹2,00,000 | ₹78,000 | 360–400 units |
| 5 kW | Home with two ACs | ≈ ₹3,00,000 | ₹78,000 | 600–650 units |
| 10 kW | Shop, clinic, office | ₹5,50,000–6,00,000 | Accelerated depreciation | 1,200–1,250 units |
| 25–100 kW | School, hospital, factory | ₹45,000–54,000 per kW | Accelerated depreciation | ≈ 125 units per kW |
Prices include Waaree, Adani or Tata panels (DCR for subsidy projects), a branded grid-tied inverter, galvanised structure, Polycab/Havells cabling, DC/AC protection, earthing, lightning arrester, installation, commissioning and the full net-metering and subsidy paperwork.
On-grid vs hybrid vs off-grid
| On-grid | Hybrid | Off-grid | |
|---|---|---|---|
| Battery | None | Yes | Yes, large |
| Works in a power cut | No | Yes (backed-up circuits) | Yes |
| Net metering | Yes | Yes | No |
| PM Surya Ghar subsidy | Yes | Yes (panel capacity) | No |
| 3 kW cost | ≈ ₹2,00,000 | ₹3,00,000–3,50,000 | ₹2,80,000–3,50,000 |
| Best for | Most homes and businesses | Frequent cuts, clinics, resorts | No grid access |
For a home or business with a reasonably stable supply, on-grid gives the best return on every rupee. See the hybrid solar system page if outages are a real problem where you are.
Net-metering approvals in MP and Chhattisgarh
In Madhya Pradesh, on-grid systems are net-metered under the MPERC regulations through MPMKVVCL (Bhopal and Gwalior regions) or MPPKVVCL (Jabalpur region, including Balaghat and Shahdol). In Chhattisgarh, under the CSERC regulations, through CSPDCL. Capacity is limited to your sanctioned load; where that is too low, Sunvera files a load-enhancement request alongside. The sequence is application, feasibility, installation, inspection, bi-directional meter — typically three to six weeks for homes and four to eight for commercial projects, with Sunvera preparing every document and attending the inspection.
Five myths about on-grid solar
- "It runs my home during a cut." It does not — it shuts down for line safety. That is a hybrid system's job.
- "I need a battery to use solar at night." Not with net metering: daytime exports are credited against night-time imports on the bill.
- "Bigger is always better." Annual surplus is paid at a low DISCOM rate, so a system larger than your consumption earns less per kW.
- "It stops working in the monsoon." Output falls to about half on cloudy days but never stops; the annual total is what counts, and spring surplus covers the monsoon.
- "The DISCOM can refuse at will." Net metering is a regulated right up to your sanctioned load under MPERC and CSERC rules; refusals are usually about load or transformer capacity, which can be fixed.
Getting started
Send your last twelve electricity bills on WhatsApp to +91 77103 07937 or visit any Sunvera office — Pichhore (Shivpuri), Gwalior, Balaghat or Bilaspur. You get a preliminary size and price the same day, a free site survey within the week, and a written proposal naming every component, the subsidy, the finance option and the expected monthly generation for your district.
Frequently Asked Questions
A rooftop solar system connected to the electricity grid through a grid-tied inverter and a bi-directional net meter. Your building uses solar power first, surplus is exported to the grid as a credit, and you import from the grid when needed — paying only for the net difference.
About ₹2,00,000 for 3 kW and ₹3,00,000 for 5 kW installed by Sunvera, before the PM Surya Ghar subsidy of up to ₹78,000 for homes. Commercial on-grid plants of 25–100 kW cost roughly ₹45,000–54,000 per kW.
No. The inverter shuts down within a fraction of a second when the grid fails — anti-islanding protection — so no power flows into lines being repaired. If you need backup, a hybrid system adds a battery that runs selected circuits through outages.
The bi-directional meter records units you export to the grid and units you import. Each billing cycle the DISCOM charges only for imports minus exports. Any surplus at the end of the settlement year is paid at the DISCOM's approved rate, which is lower than the retail tariff.
Yes — on-grid residential systems with DCR panels installed by a registered vendor get ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, a maximum of ₹78,000. Sunvera Energy is a registered vendor and files the claim.
Divide your annual electricity units by 1,500 — the yearly output of 1 kW in Madhya Pradesh and Chhattisgarh. A home using 4,500 units a year needs 3 kW; 7,500 units needs 5 kW. Sunvera sizes from your last twelve bills.
Written generation estimate, exact price after subsidy and bank-finance options — no obligation.