A solar energy audit in Bilaspur can start with a short walk-in visit. Bring your last twelve CSPDCL bills to Sunvera Energy's office in front of Hanu Traders, Nutan Chowk, Seepat Road, and the team will read your yearly units, check your sanctioned load and tell you the size that fits — for most homes using 4,000–4,500 units a year, that is 3 kW at ₹1,80,000–2,00,000 before ₹1,08,000 of subsidy. For shops in Gol Bazaar and Sadar Bazaar, coaching institutes, hospitals and units in Sirgitti and Tifra, the audit goes further: a load study by hour and season, tariff and demand review, and a written payback model.
Why an audit comes first
Most disappointment with solar comes from the wrong size. A family that buys 5 kW on the strength of one May bill finds that in winter its system exports large surpluses settled at a low rate. A shop that buys 3 kW to save money finds the AC alone needs more. An audit uses a full year of data so the system matches how you actually use power — and in Bilaspur, where summers reach the mid-40s and winters are mild, the gap between May and December bills can be very large.
The home audit, step by step
- Add the units on twelve months of bills to get your yearly use.
- Divide by about 1,450–1,500 to get the kW that matches it.
- Check the sanctioned load and connection type on the bill.
- Note big appliances and any planned additions — a new AC, a geyser, a pump.
- Check the roof on the survey: shade from tanks, stair rooms and nearby floors.
- Decide on-grid or hybrid based on how often your area has cuts.
Most of this takes ten minutes at the office; the roof check is done on the free site survey.
The business audit
For commercial and industrial customers, the audit separates energy, demand and other charges on twelve bills, looks at the load hour by hour on typical working days, identifies loads that must keep running in a cut, checks power factor and large motors, and reviews the roof structure. The plant is then sized to the daytime base load in most months. The proposal includes generation, savings, payback, the effect of accelerated depreciation, and where useful, a hybrid section for critical loads.
A Bilaspur example
A coaching institute near Vyapar Vihar planned a 30 kW plant because its summer bill was high. The audit showed that classes ran from 7 am to 7 pm, but the heavy load came from ACs between 11 am and 5 pm, and evening batches drew mainly lights and fans. Its daytime base load in most months was about 18–20 kW. The recommendation was a 20 kW on-grid plant — about a third less capital than planned, with nearly all of its output used on site — and a short list of AC timing changes that cut the evening bill further.
What you receive
A written proposal with system size and type, layout, month-by-month generation, expected saving, payback, net cost after subsidies for homes, and the zero-down-payment EMI. For businesses, a payback model including accelerated depreciation. You can take it to your bank or chartered accountant, or use it to compare other quotations item by item.
Start your audit
Walk in with your bills to the office in front of Hanu Traders, Nutan Chowk, Seepat Road, or WhatsApp photos of twelve bills to +91 77103 07937. Sunvera Energy reviews them and books a site visit in Bilaspur within days.
Frequently Asked Questions — Solar in Bilaspur
A review of your electricity bills, load pattern and roof that decides the right solar size and type before you buy. For homes it starts with a walk-in bill review at Sunvera's Seepat Road office; for businesses it adds a load study and payback model.
Add up the units on twelve months of bills and divide by about 1,450–1,500, which is what each kW produces in a year in Bilaspur. A home using 4,400 units a year needs about 3 kW.
Because Bilaspur summer bills are much higher than winter ones. Sizing from May oversizes the system, and the surplus exported in winter is settled at a lower rate than your tariff, so the extra panels do not pay back.
Twelve months of bills split into energy and demand charges, hour-by-hour load on working days, critical loads, power factor and motors, roof structure, and a payback model including accelerated depreciation.
About ten minutes at the office with your bills, followed by a site survey of the roof within days. You then receive a written proposal with size, generation, saving and EMI.
Written generation estimate, exact price after subsidy and bank-finance options — no obligation.