☀ PM Surya Ghar Registered EPC
Residential solar

Solar for Housing Society Common Areas, Apartments & RWAs

Solar for housing society common areas is the single best-value solar project in a city: lifts, water pumps, corridor and compound lighting, gates and clubhouses run on a commercial-rate common meter that every resident pays for through maintenance, and the PM Surya Ghar scheme gives societies ₹18,000 per kW for these plants. Sunvera Energy designs and installs 10–100 kW society plants across Madhya Pradesh and Chhattisgarh — Bhopal, Gwalior, Bilaspur and Korba especially — and handles the committee proposal, the subsidy application in the society's name and DISCOM net metering.

Where a society's common bill goes

LoadTypical shareWhen it runs
Water pumps (borewell, overhead tank, booster)25–35%Mornings and evenings, often daytime refills
Lifts20–30%All day, peaks morning and evening
Corridor, staircase, compound and parking lights15–25%Evening and night
Clubhouse, gym, pool, community hall10–20%Daytime and evenings
Gate, intercom, CCTV, fire systems, STP5–15%24 hours

Daytime loads — pump refills, lifts, clubhouse, STP — use solar directly; evening lighting is covered by net-metering credits from midday exports. A 100-flat society commonly spends ₹40,000–80,000 a month on this meter.

The numbers for a typical society

15 kW25 kW50 kW
Suits40–60 flats80–120 flats150–300 flats
Installed cost₹7.5–8.5 lakh₹12.5–13.5 lakh₹22.5–25 lakh
Subsidy at ₹18,000/kW₹2,70,000₹4,50,000₹9,00,000
Net cost≈ ₹5–6 lakh≈ ₹8–9 lakh≈ ₹13.5–16 lakh
Annual generation21,500–22,500 units36,000–38,000 units72,000–75,000 units
Annual saving (≈ ₹8.5/unit)≈ ₹1.9 lakh≈ ₹3.1 lakh≈ ₹6.2 lakh

Divided per flat, a 25 kW plant for 100 flats costs about ₹8,000–9,000 each after subsidy and saves about ₹3,000 each per year — a payback of under three years, then two decades of lower maintenance charges.

Getting the committee and residents on board

  1. Collect the common-area bills for the last twelve months from the treasurer.
  2. Book a free terrace survey — usable area, shading from tanks and lift rooms, waterproofing and structure.
  3. Receive a committee-ready proposal with size, cost, subsidy, per-flat contribution, per-flat saving and payback.
  4. Present it to the managing committee; Sunvera can attend to answer technical questions.
  5. Pass a general body resolution approving the project, funding method and authorised signatory.
  6. Application and installation — subsidy and net metering filed in the society's name; installation in one to two weeks.

Funding options

  • Sinking or corpus fund — the simplest; the fund is replenished by the saving within three years.
  • One-time contribution from each flat, typically ₹5,000–10,000 after subsidy for a mid-size society.
  • Bank loan in the society's name, with the saving covering the instalment; the subsidy can prepay part of it when it arrives.
  • Builder handover — in new projects, the developer installs the plant before handing over to the society.

Designing for an apartment terrace

A society terrace is busy: overhead tanks, lift machine rooms, existing hot-water collectors, mobile towers, dish antennas and sometimes a garden or event space. Sunvera's survey maps every obstruction and its shadow through the day and across seasons, then places panels where they get full sun without blocking access to tanks or the lift room. Elevated structures raise the array above head height where residents use the terrace, and walkways are left for maintenance staff. Cable routes are planned down an existing shaft to the common-area meter room, so nothing runs across balconies. Terraces on multi-wing complexes can be connected to one inverter room, keeping metering simple.

Reporting to residents

Residents back a project they can see working. Every society plant comes with monitoring access for the committee and facility manager, and many societies put a small screen near the entrance or share a monthly screenshot on the residents' group showing units generated and rupees saved. At each annual general body meeting, the treasurer can present the year's generation, the reduction in the common bill and how the saving was used — lower maintenance, a bigger sinking fund or loan repayment. This transparency also makes later decisions, such as adding capacity or a battery for lifts, much easier to approve.

Common concerns, answered

  • "We use the terrace." Elevated structures keep it usable for drying clothes, functions or a garden.
  • "Top floors will get leaks." Mounts are fixed with chemical anchors or ballast without breaking waterproofing; existing leaks are fixed first.
  • "Who maintains it?" An AMC covers cleaning and inspections; the facility manager just checks the app.
  • "Can individual flats also install?" Yes, on an allotted roof share with a society NOC and their own meter, but the common-area plant should come first because it benefits everyone.

Approvals and after-sales

The application is made on the PM Surya Ghar portal in the society's name, with its registration certificate, PAN, the resolution and the common-area consumer number; net metering goes through MPMKVVCL, MPPKVVCL or CSPDCL. Sunvera prepares all documents and attends the DISCOM inspection. After commissioning, the society receives monitoring access for the committee and facility manager, and an annual generation report for the general body meeting. Sunvera has prepared society proposals and filed applications in RWAs' names in Gwalior and Bhopal. Call +91 77103 07937 or send your common-area bills on WhatsApp for a committee-ready proposal.

Frequently Asked Questions

Get a free site survey

Written generation estimate, exact price after subsidy and bank-finance options — no obligation.