Solar for factory owners is ultimately a cost-of-production decision: on industrial tariffs of ₹8–11 a unit, electricity is often a top-three cost after raw material and labour, and every unit a rooftop plant supplies during a shift comes off that bill. Sunvera Energy helps manufacturers across Madhya Pradesh and Chhattisgarh — from the Malanpur estate near Gwalior and Mandideep near Bhopal to Sirgitti in Bilaspur and the Baloda Bazar cement belt — work out how much of their load solar can carry, what it costs per unit over 25 years, and how it changes the price of what they make.

Think in rupees per unit, not rupees per kW

Plant owners often compare solar quotations on price per kW. A more useful number for a factory is the levelised cost per unit: the plant's total cost over its life divided by the units it will produce. A 100 kW plant at about ₹47 lakh, with perhaps ₹8–10 lakh of cleaning, inverter replacement and maintenance over 25 years, produces roughly 33–35 lakh units after allowing for panel degradation. That works out to about ₹1.6–1.7 per unit — and around ₹2–2.5 even after financing costs — compared with ₹8–11 per unit from the DISCOM, a tariff that has historically risen every few years. Seen this way, a rooftop plant is a long-term contract for cheap electricity at a fixed price.

How factory shift patterns change the answer

Operating patternDaytime share of loadSolar self-consumptionSizing approach
Single shift, 9 am – 6 pm, six days85–95%Very high on working daysSize to working-day load; Sundays export
Two shifts, 6 am – 10 pm60–70%HighSize to the day-shift base load
Continuous process, three shifts35–45%Near-total; plant is small relative to loadSize freely up to roof and sanctioned load
Seasonal (food processing, ginning)Varies by monthHigh in seasonModel month by month

For single-shift units, weekly holidays and festival closures mean some generation is exported, so the plant should not exceed the working-day load. For continuous-process plants the opposite is true: the factory can absorb all the solar the roof can carry.

Effect on your cost of production

Consider a fabrication unit in Malanpur using 30,000 units a month at an effective ₹9.5 per unit — ₹2.85 lakh a month. A 100 kW plant generating about 12,000–12,500 units a month replaces roughly 40 per cent of that, saving about ₹1.15 lakh a month or ₹14 lakh a year. If the unit produces 500 tonnes a month, power cost per tonne falls by about ₹230. For a price-sensitive manufacturer competing on thin margins, that is a structural advantage that lasts as long as the plant does, with accelerated depreciation adding a tax benefit in the early years.

What your buyers may ask

Large brands, OEMs and export customers increasingly send suppliers questionnaires about energy use and renewable sourcing as part of their own sustainability reporting. A rooftop plant gives a factory a measurable, documented answer: installed capacity, annual generation from the monitoring system, and the share of total consumption it covers. Sunvera provides annual generation reports in a format that can be attached to such questionnaires or to the factory's own sustainability disclosures.

Engineering for production buildings

  • Roof assessment. Production sheds carry cranes, ducts and skylights; the layout works around them, and purlin capacity is checked for the added 15–20 kg per sq m.
  • Dust and fumes. Arrays are positioned away from exhaust stacks and dust extraction outlets, with a cleaning frequency matched to the process.
  • Electrical integration. Inverters feed the main LT panel or a dedicated solar panel; protection is coordinated with the factory's existing breakers and earthing, and harmonics from large drives are considered.
  • Monitoring. Plant-level and inverter-level monitoring with alerts, so the maintenance team sees a dropped string the same day.
  • Safety. Walkways, lifelines for roof access and isolation points that the factory's electrical team can lock out.

Typical factory plant sizes and costs

PlantRoof neededInstalled costAnnual generationAnnual saving at ₹9.5/unit
50 kW≈ 5,000 sq ft₹22.5–25 lakh72,000–75,000 units≈ ₹7 lakh
100 kW≈ 10,000 sq ft₹45–50 lakh1.45–1.5 lakh units≈ ₹14 lakh
250 kW≈ 25,000 sq ft₹1.08–1.2 crore3.6–3.75 lakh units≈ ₹35 lakh
500 kW≈ 50,000 sq fton design7.2–7.5 lakh units≈ ₹70 lakh

Costs include tier-1 modules from Waaree, Adani or Tata, inverters, structure, cabling, protection, monitoring, installation, commissioning and approvals. Savings assume the output is consumed on site.

Financing a factory plant

Factories fund rooftop plants in three common ways. Own capital gives the best return and lets the business claim accelerated depreciation in the early years. A term loan from the factory's existing bank — SBI, HDFC Bank, PNB or Bank of Baroda — is often structured so that the monthly saving covers most of the instalment from the first month. Phased installation lets a unit start with the roof over its heaviest daytime load and add capacity in a second phase once the first has proved its numbers. Sunvera's proposal shows the cash flow for each option so the owner and accountant can compare them side by side.

Approvals and the next step

Factories connect under MPERC rules through MPMKVVCL or MPPKVVCL in Madhya Pradesh and under CSERC rules through CSPDCL in Chhattisgarh, with a single-line diagram, structural certificate, inverter certificates and, above set capacities, electrical-inspector approval. Sunvera prepares the full file; approvals typically take six to ten weeks. To get a plant size, cost per unit and payback for your factory, send twelve months of bills and your shift pattern to +91 77103 07937. See also the industrial solar installation page for engineering and O&M details.