As a solar EPC company, Sunvera Energy takes full responsibility for a solar project from the first drawing to the day the plant is handed over — engineering, procurement and construction under one contract, with one accountable team. Sunvera is registered on the PM Surya Ghar portal and delivers rooftop and ground-mounted projects for homes, housing societies, businesses, institutions and industry across Madhya Pradesh and Chhattisgarh from offices at Pichhore (Shivpuri), Gwalior, Balaghat and Bilaspur. Single-point responsibility means no gaps between designer, supplier and installer when something needs fixing.
What EPC means — and why it matters
In an EPC contract, one company does all three: Engineering (designing the system), Procurement (buying and delivering the right equipment) and Construction (building, testing and commissioning it). The alternative — a designer here, a panel supplier there, an electrician for wiring and someone else for the DISCOM file — leaves the owner coordinating and arbitrating when things go wrong. With EPC, if a string underperforms, the structure rusts or the net meter is delayed, there is one company responsible for fixing it. For anything beyond a small home system, that accountability is the main thing you are paying for.
Engineering
- Site survey — roof or ground measurement, shading analysis across seasons, access, meter and cable routes.
- Load and bill study — sizing to consumption and self-consumption, not to roof area.
- Layout design — module placement, row spacing, walkways and cleaning access.
- Structural design — galvanised structures for regional wind loads; roof capacity checks; non-penetrative mounting on sheet roofs.
- Electrical design — string sizing, inverter selection, cable sizing for voltage drop, protection, earthing and lightning protection; single-line diagram.
- Generation model — expected monthly output for the site's location, tilt and orientation, used for the savings and payback figures in the proposal.
Procurement
Sunvera sources tier-1 modules from Waaree, Adani and Tata — DCR modules for PM Surya Ghar projects — branded grid-tied and hybrid inverters, hot-dip galvanised structures, Polycab and Havells cables and switchgear, and certified protection devices. Every proposal names the make and model of each major component. Procurement also covers logistics to site, quality checks on delivery and keeping serial numbers and certificates for the subsidy file and warranties.
Construction and commissioning
- Mobilisation — site safety, material staging and work scheduling around the customer's operations.
- Structure — anchoring or ballasting, assembly and alignment.
- Modules and wiring — module mounting, string wiring, DC combiner boxes, cable routing in protected conduit.
- Inverters and AC — inverter installation in a shaded, ventilated location; AC distribution and protection; tie-in to the main panel.
- Earthing and lightning — dedicated earth pits, bonding, lightning arrester.
- Testing — insulation resistance, polarity, open-circuit voltage and short-circuit current per string, earth resistance, functional tests.
- Approvals and metering — DISCOM inspection, bi-directional meter, electrical-inspector approval where required.
- Handover — commissioning report, as-built drawings, warranties, monitoring access and owner training.
Quality control at every stage
An EPC company's value shows in the checks nobody sees. At design stage, Sunvera reviews shading, string sizing and cable voltage drop before the layout is fixed. At procurement, deliveries are checked against the bill of materials and module serial numbers recorded for warranties and subsidy files. During construction, structure alignment, clamp torque, connector crimping and cable routing are inspected before modules are energised. Before handover, every string is tested and the results compared, so a weak module or bad connection is found and fixed on day one rather than discovered in the first summer's generation figures.
Documentation you receive
EPC handover includes the approved design and single-line diagram, as-built drawings for larger plants, the bill of materials with makes and serial numbers, test and commissioning reports, DISCOM and electrical-inspector approvals, net-metering documents, warranty certificates for modules, inverters and workmanship, and the operation and maintenance manual. For PM Surya Ghar projects, the subsidy file status is tracked until the credit reaches the customer. Keeping this documentation in one place makes future warranty claims, insurance claims and capacity expansions straightforward.
EPC for different customers
For a homeowner, EPC simply means one company handles everything, including the subsidy. For a housing society, it adds the committee proposal and application in the society's name. For a business, it adds structural certification, electrical-inspector approvals and a payback model for the finance team. For industry, it adds load studies, month-by-month sizing and a long-term O&M plan. The same accountable team runs each project from survey to handover.
Project scale and timelines
| Project | Typical capacity | On-site work | Total timeline incl. approvals |
|---|---|---|---|
| Home | 2–5 kW | 1–2 days | 4–8 weeks |
| Shop, office, clinic | 5–25 kW | 2–5 days | 4–8 weeks |
| School, hospital, society | 25–100 kW | 1–2 weeks | 6–10 weeks |
| Factory, mill, warehouse | 50–500 kW | 2–6 weeks | 8–14 weeks |
Most of the timeline is DISCOM and inspection processing, which Sunvera files and follows up throughout.
Projects delivered
Sunvera's completed work includes a 75 kW warehouse rooftop plant in Bilaspur on non-penetrative mounting, a 10 kW hybrid system with battery backup for a hospital in Gwalior, a 12 kW combined solar-wind hybrid pilot in rural Chhattisgarh, and residential and commercial systems across both states. Details are on the projects page, and prospective commercial customers can review monitoring data from reference plants.
Choosing an EPC company — what to check
- PM Surya Ghar registration for residential and society projects
- Completed projects you can visit, ideally of similar size and type
- Named components and written warranties for panels, inverters and workmanship
- A structural and electrical design you can see before work starts
- Who files DISCOM approvals and how follow-up is handled
- After-sales: AMC or O&M options and the nearest service office
To discuss a project with Sunvera's engineering team, call +91 77103 07937 or send your bills and site details on WhatsApp.
Frequently Asked Questions
It takes responsibility for the whole project under one contract: engineering (survey, load study, structural and electrical design), procurement (panels, inverters, structures, cables, protection) and construction (installation, testing, approvals, net metering, commissioning and handover).
Yes. Sunvera Energy is registered on the PM Surya Ghar national portal and delivers rooftop and ground-mounted projects across Madhya Pradesh and Chhattisgarh from offices at Pichhore, Gwalior, Balaghat and Bilaspur.
Single-point responsibility. With separate designers, suppliers and electricians, the owner coordinates everyone and arbitrates when something goes wrong. With EPC, one company is accountable for performance, quality, approvals and fixes.
On-site work ranges from one to two days for a home to two to six weeks for a large factory plant. Including DISCOM and inspection processing, total timelines range from about four weeks for homes to around fourteen weeks for large industrial projects.
Tier-1 modules from Waaree, Adani and Tata — DCR modules for subsidy projects — branded grid-tied and hybrid inverters, hot-dip galvanised structures and Polycab and Havells cables and switchgear. Every proposal names the make and model of each major component.
Written generation estimate, exact price after subsidy and bank-finance options — no obligation.